忍者ブログ

Accelerator

I have been studying accelerators for about 20 years. I have experience designing, building, and measuring accelerators, and I would like to continue making a living with accelerators. I'm thinking of starting a blog as a reminder and spreader of the accelerator.

Transfer Matrix

×

[PR]上記の広告は3ヶ月以上新規記事投稿のないブログに表示されています。新しい記事を書く事で広告が消えます。

コメント

ただいまコメントを受けつけておりません。

Transfer Matrix

We calculate by a 2x2 matrix for the beam simulation, which operates on a vector describing an incoming beam to calculate the outgoing beam.

Here is an example of the definition of topical magnetic fields for beams.
https://indico.cern.ch/event/528094/contributions/2213316/attachments/1322590/1984069/L3-4-5_-_Transverse_Beam_Dynamics.pdf

If we calculate the matrix by Excel, you may write like the below:
download for the excel file.

In excel, I defined drift space, quadrupole magnet, and dipole magnet.
PR

コメント

Profile

HN:
Kaneta
Occupation:
Engineer
My Former Projects:
1. Adjustment of 324MHz circulator by network analyzer for KEK(2010-11).
2. Experiment of S-band vacuum circulator for Spring-8 (2010-13).
3. Designing, manufacturing, adjustment and high-power test of 508MHz water load for Spring-8 (2011-13).
4. Bead pull measurement of a traveling wave type accelerator for Spring-8 (2012-13).
5. Designing, manufacturing, adjustment and low power test of C-band accelerator and pre-buncher (2013-14)
6. Designing, manufacturing, adjustment and high-power test of X-band circulator for University of Tokyo (2013-15).
7. Measurement of X-band standing wave type accelerator for CygneX 1 System applying FDA 510k number K143560 (2013-15)
8. Designing, manufacturing, adjustment and high-power test of C-band circulator and standing wave type accelerator for AIST (2015-16)
9. Designing, manufacturing and low-power test of X-band circulator and standing wave type accelerator (2016-17)
10. Designing of proton accelerators (RFQ and DTL) (2016-17)
11. Designing of proton accelerators (RFQ and RFI) (2017-19).
12. Management of treatment planning system applying PMDA (2017-21).
13. Management of accelerator system applying PMDA (2017-21).